Main projects:
- “ArcelorMittal Kryvyi Rih” PJSC, Kryvyi Rih, gas booster station 1 and gas booster station 2Design and calculation of water-supply, fire fighting, and sewerage systems.
- “SEVGOK” PJSC, Kryvyi Rih.New construction of a complex for thickening process tailings in the industrial area of the process water and slime facility shop. Design and calculation of water-supply, fire fighting, and sewerage systems.
- “KAMETSTAL” PJSC, BF1m and BF9.Hydraulic and thermotechnical calculations of the chemically treated water cooling system in a closed loop for cooling staves of the bosh and 1st-4th shaft rows.
Get an engineering consultation from our expert
