Major objects:
- The Zaporizhzhya NPP. Reconstruction.
- The South-Ukraine NPP. Reconstruction.
- ”Obra” Thermal Power Plant. Blocks No.1, 2. With a capacity of 50 MWth. Reconstruction.
- The «Bushehr» NPP. Block No.1. New construction.
- Thermal Power Plant-4, Ulaanbaatar, (Mongolia). Extension with the installation of turbo generator Т-120/130-130-8МО.
- Construction of an energy complex for a sulfuric acid plant in the village of Zhanakorgan.
- “Ilyich Iron and Steel Works” PJSC, Mariupol. Reconstruction with new construction of GCPs for BF No. 2,4,5 cast houses and stockhouse.
- “МК “Аzovstal” PJSC, Mariupol. Electrical generator unit. PK 1. Reconstruction of converter gas cleaning system for the converter shop.