Main activity: developing a technological part of projects on sinter plants’ construction and reconstruction.
Over 30 large objects.
Main implemented projects:
Kazphosphate, Taraz, Kazakhstan
Sinter plant for the production of phosphorite sinter.
Kamet-Stal, Kamenskoye
Sinter shop No. 2. Overhaul the air supply system to the sinter cooling zone and the shelter for sintering machine No. 7. Working documentation.
Metal Recovery-Serbia
Creation of an enterprise for the utilization of metal-containing semi-finished products. Furnace department. Project.
ArcelorMittal Kryvyi Rih
Blast furnace shop No. 2. New complex construction for preparation and injection of pulverized coal fuel into blast furnace No. 9. Coal acceptance and storage department. Project. Working documentation.
Alchevsk Iron and Steel Works
Pulverized coal injection into blast furnaces No. 1,3,4,5. Coal warehouse. Coal preparation. Dust preparation department. Pneumatic transport of pulverized coal. Feasibility study. Project. Working documentation.
