Major projects:
- 2021-2022. “ArcelorMittal Kryvyi Rih” PJSC, Kryvyi Rih. New construction of mixed gas pipelines and buildings of gas booster stations No. 1 and No. 2 of the steam-gas plant on the territory of «ArcelorMittal Kryvyi Rih» PJSC.
- 2016-2018. PJSC “МК “Аzovstal”, Mariupol. 2nd stage overhaul of BF №3. Design. Working documentation. Commissioning.
- 2014-2015. ArcelorMittal Temirtau Kazakhstan, Temirtau. 2nd stage overhaul of BF №4. BF cooling system. Stockhouse reconstruction. Utility lines of the coneless top charger.
- 2012-2013. “Tulachermet” OJSC, Tula. Hot metal desulfurization. Design documentation.
Get an engineering consultation from our expert
