Tetiana Bondarieva

Chief of the blast furnace department
Work experience: 32 years.

Major projects:

  • 2019-2021. Kryvyi Rih, “ArcelorMittal Kryvyi Rih” PJSC. Reconstruction of the complex of BF №9. Design. Working documentation.
  • Kryvyi Rih, “ArcelorMittal Kryvyi Rih” PJSC. Blast furnace shop №1. BF №8. Cooling of the backdraft system tube. Main design solutions. Detailed engineering. Commissioning.
  • 2012-2013. Tula. “Tulachermet” PJSC. Reconstruction of BF №3. Design documentation.
  • 2006-2007. Alchevsk. “Alchevsk Iron and Steel Works” PJSC. Reconstruction of the BF №1 complex, volume 3000 m3. Detailed engineering.
Get an engineering consultation from our expert