Oleksandr Vasyliev

Chief designer of the blast furnace department
Work experience: 40 years.

Major projects:

  • “МК “Аzovstal” PJSC, Mariupol. BF №6 reconstruction. Design. Cooling system, process «dry-type» gas cleaning plant, HBS block, water supply and wastewater disposal. BIM model of the blast furnace complex.
  • 2016-2018. “МК “Аzovstal” PJSC, Mariupol. 2nd stage overhaul of BF №3. Design. Working documentation. Commissioning.
  • 2015-2016. Kryvyi Rih, “ArcelorMittal Kryvyi Rih” PJSC. Design and Working documentation for replacement of HBS №2, BF№9. Commissioning.
  • 2012 – 2013. Mariupol. METINVEST. Iron and Steel Works “Azovstal”. BF №4 overhaul. Design. Working documentation. Commissioning.
  • 2006-2007. Alchevsk. “Alchevsk Iron and Steel Works” PJSC. Reconstruction of the BF №1 complex, volume 3000 m3. Detailed engineering. Commissioning.