Oleksiy Detystov

Chief process engineer of the power department
Work experience: 44 years. Hydraulic and thermal calculations of blast furnace cooling systems;

Development and calculation of water supply, fire-fighting, and sewerage systems;

Development and calculation of utility piping for ferrous metallurgy enterprises.

Main projects:

  • “ArcelorMittal Kryvyi Rih” PJSC, Kryvyi Rihgas booster station 1 and gas booster station 2Design and calculation of water-supply, fire fighting, and sewerage systems.
  • “SEVGOK” PJSC, Kryvyi Rih.New construction of a complex for thickening process tailings in the industrial area of the process water and slime facility shop. Design and calculation of water-supply, fire fighting, and sewerage systems.
  • “KAMETSTAL” PJSC, BF1m and BF9.Hydraulic and thermotechnical calculations of the chemically treated water cooling system in a closed loop for cooling staves of the bosh and  1st-4th shaft rows.